日韩欧美中文另类一区-亚洲欧美日韩另类丝袜一区二区-午夜福利资源激情视频-黑丝美女张开腿让男人桶

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://sznewtr.com  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

山東電纜橋架選擇安裝注意事項(xiàng)

  山東電纜橋架選擇安裝注意事項(xiàng):
  Shandong cable tray selection installation note:
  1.電纜橋架的大載荷、支撐間距應(yīng)小于允許載荷和支撐跨距。
  The maximum load, 1 cable tray support spacing should be less than the allowable load and support span.
  2.橋架的安裝應(yīng)以規(guī)范為準(zhǔn),目前可參照《電纜橋架安裝圖集86SD169》進(jìn)行。橋架在安裝過程中嚴(yán)禁載人,如現(xiàn)場情況確有必要時,必須有保障設(shè)施方可載人,本事項(xiàng)對于不合格或非的操作人員尤為重要。
  2 bridge should be installed in the national standards, the reference to "86SD169" of cable tray installation atlas. Bridge in the installation process is strictly prohibited manned, such as the scene when necessary, must have the safety protection facilities shall be manned, this for the unqualified or non professional personnel is very important.
  3.橋架的立柱、托臂等支架可與基礎(chǔ)預(yù)埋件焊接固定,也可采用膨脹螺栓固定,對于現(xiàn)場焊接處一定要做好防腐處理,通常由用戶現(xiàn)場涂刷防腐漆。
  The column, the bracket can be fixed with 3 bridge welding based embedded parts, also can use expansion bolts, the welding place should be well treated, usually by the user site besmear brushs anticorrosive paint.
  4.電纜橋架水平敷設(shè)時,橋架間的對接處距支承點(diǎn)的距離應(yīng)在跨距的1/4以內(nèi),對于大跨距橋架好放在支承架上對接,在有彎通或三通的地方則需單獨(dú)增加支承點(diǎn),垂直方向的托臂每隔1.5m設(shè)一固定點(diǎn)。
  4 cable bridge horizontal laying, the distance of supporting points should be in 1 / 4 span bridge within the joint between the distance, it is better for large span bridge connection on the supporting frame, were individually increases the supporting point in a general or three place, perpendicular to the direction of the bracket is provided with a fixed interval of 1.5m.
  5.橋架內(nèi)的電纜應(yīng)用電纜卡帶、或金屬電纜卡子進(jìn)行分組固定。對于水平敷設(shè)的電纜通常每隔2m左右作一固定點(diǎn);對于垂直敷設(shè)的電纜應(yīng)每隔1—1.5m固定一次,在改變標(biāo)高的端部也應(yīng)予以固定。
  Cable cable cassette, or metal cable clip 5 group fixed tray. For laying cable level usually every 2m around a fixed point; the cable lifting should be every 1 1.5m fixed time, in the end changes should also be fixed.
  6.電纜橋架按電力施工規(guī)范要求應(yīng)進(jìn)行良好接地,對于鍍鋅電纜橋架無須有專門接地裝置,其本體即可作為接地干線;對于表面進(jìn)行非金屬處理的橋架則必須有專門的接地裝置;橋架的接地線可用VV-16mm2電纜或等截面的銅編織線,該線通常由用戶自備,如由本廠供貨,則應(yīng)在合同中注明,長距離的電纜橋架每隔30—50m接地一次。
  6 cable tray should be a good grounding in electric power construction specifications, for galvanized cable tray without special grounding device, which can be used as a grounding line; for the surface of non metal bridge must have ground special equipment; bridge ground be used VV-16mm2 cable or section of the copper braided wire, the line is owned by the user, such as by the factory delivery, it should be noted in the contract, the long distance cable tray every 30 50m grounding once.
  以上就是山東電纜橋架公司發(fā)布,如果還有什么疑問,歡迎來電咨詢!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
国产精品日韩精品欧美精品| 欧美尤物操逼毛茸茸真爽| 亚洲日韩不卡一区二区三区| 色狠狠久久av北条麻妃| 精品久久久久久久人妻换| 欧美日韩久久久久久久久| 91精品国产综合久久久蜜| 最新AV中文字幕在线看| 日本黑鸡吧黄色录像| 尤物性生活午夜在线视频| 中文字幕一高清免费视频| 久久久精品亚洲Av| 中文字幕不卡一区二区免| 欧美 日本 亚洲 国产| 中文字幕在线观一二三区| 中文有码无码人妻在线看 | 下载风骚美女想吃大机吧| 91热国产在线观看| A级毛片毛片免费观看久| 综合伊人久久在一二三区| 亚洲人成在线不卡网| 亚洲午夜国产片在线观看| 熟妇女人妻丰满中文字幕| 国产裸体视频BBBBB| 插女人下面高潮视频| 性色av少妇一区二区三区多人| 久久久久久国产A免费观看| 日韩午夜免费av在线| 90岁肥老奶奶毛毛外套| 90岁肥老奶奶毛毛外套| 日韩美女一区二区三区香蕉视频| 操鸡巴奶子在线观看| 午夜性刺激在线视频免费| 精品福利一区二区三区在线观看| 女人18片毛片。| 日韩欧美综合一二三区| 夜夜38亚洲综合网| 浪潮AV色综合久久天堂| 大男人在线无码直播| 男人天堂av在线免费看| 欧美日韩亚洲人人夜夜澡|